Export inquiries: export@tongming.com.cn · +86 573 8220 3125 B2B login 中文

Manufacturing

Three campuses, one flow

From wire rod to packed carton on our own sites, with automation at every hand-off and inspection enforced by the manufacturing execution system.

Quality assurance

  1. 1

    Incoming inspection

    Every coil of wire rod is tested against the steel mill's certificate before it enters production.

  2. 2

    MES at every machine

    The manufacturing execution system checks that material, machine and work order match, and enforces first-piece inspection before a run starts.

  3. 3

    Spot checks and final inspection

    Production and QC staff sample during the run. Finished goods pass visual and mechanical inspection immediately after the last stage, so investigations are fast and packing is prompt.

  4. 4

    Audited systems

    Internal and external audits under ISO 9001, ISO 14001, ISO 45001 and IATF 16949 keep the system honest and improving.

Three campuses

  • Changsheng Road campus
    1995

    Changsheng Road campus

    Headquarters, bolt factory, 20,000-position automated warehouse, laboratory

    88 East Changsheng Road, Jiaxing Economic Development Zone, Jiaxing, Zhejiang 314003

  • Tong He wire factory
    2022

    Tong He wire factory

    Stainless steel wire: cold heading, re-drawing, nail, rivet, weaving, EPQ, spring wire

    Chengnan Industrial Park, Heping Town, Changxing County, Huzhou, Zhejiang 313103

  • Gaoke plant
    2023

    Gaoke plant

    Nuts and screws, digital smart factory with about 15,000 automated storage positions and RGV transfer

    1313 Weiye Road, Chengnan Subdistrict, Nanhu District, Jiaxing, Zhejiang 314001

The process

  1. Wire rod1Wire rod
  2. Coating2Coating
  3. Drawing3Drawing
  4. Forming4Forming
  5. Threading / tapping5Threading / tapping
  6. Transferring6Transferring
  7. Automatic passivating7Automatic passivating
  8. Inspection8Inspection
  9. Packing9Packing

Smart factory

Automated storage and retrieval, RGV delivery between stages and immediate packing after inspection cut touch points and lead time. The Gaoke plant, opened in 2023, is a digital smart factory for nuts and screws with about 15,000 automated storage positions. AI-assisted scheduling software forecasts, schedules, tracks and alerts across all three sites.

The laboratory

The laboratory

Certifications

  • ISO 9001Quality managementTÜV RheinlandDownload PDF
  • ISO 14001Environmental managementTÜV RheinlandDownload PDF
  • ISO 45001Occupational health and safetyTÜV RheinlandDownload PDF
  • IATF 16949Automotive quality managementNQADownload PDF
  • CNAS L3650Accredited testing laboratoryCNASDownload PDF
  • CE PED / AD 2000Pressure Equipment Directive 2014/68/EU and AD 2000 W0TÜV RheinlandDownload PDF
  • REACH / RoHSStatements for 304 and 316
  • National "Little Giant" enterprise (2023)

Visit the factory

Customers are welcome in Jiaxing. We are two hours from Shanghai by road or forty minutes by high-speed rail.

Arrange a visitCertificates

Contact